The new Chambéry’s hospital

As part of the construction project for the new Chambéry hospital, the general contractor Dumez, Cegelec, the CH of Chambéry and the architect Brunet Saunier chose the Biolume for the equipment of the 700 rooms and Résinor for the bathrooms bedrooms.

A business assumed in equipment and facilities.

We accompanied teams for the design and realization of the rooms’ equipment in willing with the creativity of the project management:

  • Distribution of medical gas (electrical and medical) verticalized and discreet in a compact aluminum profile with two sealing lips with the wall for perfect hygiene.
  • Rugged MUSSE wall lamps made of aluminum profiles with direct and indirect lighting for patient comfort and excellent direct lighting for safe care.

The design of the pattern chosen by the architect brings a hotel look worthy of the best hotels. The wall lamp, very minimalist, integrates the motif to make it even invisible.

The 2-bed rooms are treated in the same way as an individual bed.

A night lighting integrated at the bottom of the column allows an ease in the room at night.

Room amenities:

One-piece washbasin (washbasins in synthetic resin with integrated towel rail in the design of the architect.)

Need more information ? Contact us